Accomplished projects
- Assembly of pressure part of the package I for the power units D and E.
Investor: Westfalen power plant Completion period: 2008 - 2011 - Delivery and assembly of 27 MWe steam turbine on EPC basis
Investor: International Paper – Kwidzyn Sp. z o.o. Completion period: 2008 - 2010 - Construction of new Water Treatment Plant
Investor: Zakłady Azotowe Kędzierzyn S.A. Completion period: 2008 - 2010 - Assembly of pressure part of the package 1-5 for 858 MW power unit
Investor: PGE Elektrownia Bełchatów S.A. Completion period: 2008 - 2010 - Assembly of pressure part of 2 x 1100 MW boilers for the power units F and G
Investor: Neurath power plant/Germany Completion period: 2007 - 2010 - Delivery and assembly of 100 MWe turboset together with designing and auxiliary works in Żerań Combined Heat and Power Plant
Investor: Vattenfall Heat Poland S.A. Completion period: 2007 – 2009 - Modernization of the Water Treatment Plant as a part of the Program 10+
Investor: Lotos S.A. Group Completion period: 2008 - 2009 - Scheduled overhaul of the OP - 650 boiler No. 3 in Ostrołęka B Power Plant
Investor: ENERGA Elektrownie Ostrołęka S.A. Completion period: 2008 - Modernization of the OP-230 boiler No. 1 in Żerań CHPP
Investor: Vattenfall Heat Poland S.A. Completion period: 2007-2008 - Modernization of TZ 9 and TZ 10 turbosets in Siekierki Combined Heat and Power Plant
Investor: Siemens Sp. z o.o. Completion period: 2006-2009 - Dismantling, erection and start-up of 40W biomass boilers together with infrastructure in STEICO S.A. Plant in Czarnków.
Investor: STEICO S.A. Completion period: 2006-2009 - Modernization of the R03 boiler in waste incineration plant in Rozenberg (the Netherlands)
Investor: Visser & Smit Hanab BV Completion period: 2006-2007 - Overhaul of the boiler No. 12 and erection of pipelines together with fittings and circulation pump connecting fluid chamber with the K-11 boiler. Erection of pressure part of the fluid chamber together with adjustment of its support structure
Investor: Elektrownia Stalowa Wola S.A. Completion period: 2008 - Assembly of steel structure for production building and transport galleries. Carrying out modernization of the pipeline 7/PHX-001/600
Investor: ANWIL S.A. Completion period: 2008
|