  • Assembly of pressure part of the package I for the power units D and E. 
    Investor: Westfalen power plant Completion period: 2008 - 2011
  • Delivery and assembly of 27 MWe steam turbine on EPC basis 
    Investor: International Paper – Kwidzyn Sp. z o.o. Completion period: 2008 - 2010
  • Construction of new Water Treatment Plant
    Investor: Zakłady Azotowe Kędzierzyn S.A. Completion period: 2008 - 2010
  • Assembly of pressure part of the package 1-5 for 858 MW power unit
    Investor: PGE Elektrownia Bełchatów S.A. Completion period: 2008 - 2010
  • Assembly of pressure part of 2 x 1100 MW boilers for the power units F and G
    Investor: Neurath power plant/Germany Completion period: 2007 - 2010
  • Delivery and assembly of 100 MWe turboset together with designing and auxiliary works in Żerań Combined Heat and Power Plant
    Investor: Vattenfall Heat Poland S.A.  Completion period: 2007 – 2009
  • Modernization of the Water Treatment Plant as a part of the Program 10+
    Investor: Lotos S.A. Group Completion period: 2008 - 2009
  • Scheduled overhaul of the OP - 650 boiler No. 3 in Ostrołęka B Power Plant 
    Investor: ENERGA Elektrownie Ostrołęka S.A. Completion period: 2008
  • Modernization of the OP-230 boiler No. 1 in Żerań CHPP 
    Investor: Vattenfall Heat Poland S.A. Completion period: 2007-2008
  • Modernization of TZ 9 and TZ 10 turbosets in Siekierki Combined Heat and Power Plant
    Investor: Siemens Sp. z o.o. Completion period: 2006-2009
  • Dismantling, erection and start-up of 40W biomass boilers together with infrastructure in STEICO S.A. Plant in Czarnków. 
    Investor: STEICO S.A. Completion period: 2006-2009
  • Modernization of the R03 boiler in waste incineration plant in Rozenberg (the Netherlands) 
    Investor: Visser & Smit Hanab BV Completion period: 2006-2007
  • Overhaul of the boiler No. 12 and erection of pipelines together with fittings and circulation pump connecting fluid chamber with the K-11 boiler. Erection of pressure part of the fluid chamber together with adjustment of its support structure
    Investor: Elektrownia Stalowa Wola S.A. Completion period: 2008 
  • Assembly of steel structure for production building and transport galleries. Carrying out modernization of the pipeline 7/PHX-001/600 
    Investor: ANWIL S.A. Completion period: 2008