INVESTMENT PROJECTS
  • Delivery and assembly of steel structures, flue gas ducts and an SCR reactor for the construction of a flue gas catalytic denitrogenation installation for the AP-1650 boilers No 9 and 10 along with the modernization of electrostatic precipitators for Enea Wytwarzanie Sp. z o.o.

Scope of work: delivery and assembly of a steel structure and ducts (3,452 tons)
Client: Rafako S.A.
Contract value: approx. PLN 60 million.

  • Prefabrication and assembly of a steel structure within the following assignment: “Construction of a 596 MW gas and steam power unit for PKN Orlen in Płock”.

Scope of work: delivery and assembly of a steel structure (3,500 tons), delivery and assembly of a casing for the wall and the roofs (27,320 m2).
Client: Siemens Sp. z o.o.
Contract value: PLN 42 million.

  • Assembly of a steel structure within the following project: "Construction of a 910 MW power unit at the Jaworzno Power Plant III - Power Plant II”

Scope of work: delivery and assembly of a steel structure and ducts (15,000 tons)
Client: Zamet Industry and Stal-System S.A.
Contract value: approx. PLN 20 million.

 

Selected projects implemented by the Companies that constituted Polimex Energetyka Sp. z o.o. before its consolidation in 2014::

  • Implementation of construction and assembly works for the IOS IV (a flue gas desulphurisation installation) for the power units 1-8 at the Kozienice Power Plant.   
    Client: Babcock-Hitachi Kabushiki Kaisha S.A., branch in Poland.
    Contract value: PLN 63.9 million.
  • Design, delivery and a turnkey installation of a flue gas catalytic denitrogenation system for the boilers at the CHP Plant in the Production Plant of PKN Orlen S.A. in Płock. 
    Client: PKN Orlen S.A.
    Contract value: PLN 378.4 million
  • Renovation and modernization of the main steam and water pipeline system for the power units 7-12 at the Bełchatów Power Plant 
    Client: PGE Górnictwo i Energetyka Konwencjonalna SA.

    Contract value: PLN 293,97 million
  • Connection of the power units 5, 6 and 8 to the wet flue gas desulphurisation for EDF Polska S.A., the Rybnik branch. 
    Client: EDF Polska S.A.

    Contract value: PLN 22.6 million.
  • Delivery and assembly of two 100 MW turbine sets, along with the design and accompanying works at the Żerań CHP Plant. 
    Client: Elektrociepłownie Warszawskie S.A. (PGNiG TERMIKA S.A.).

    Contract value: PLN 140.00 million Tz11 + PLN 171 PLN Tz12.
  • Implementation of a wet flue gas desulphurisation installation at the Rybnik Power Plant. 
    Client: Elektrownia Rybnik S.A.
    Contract value: PLN 228 million.
  • Construction of an installation for the production of electricity from renewable energy sources based on biomass at the Białystok CHP Plant. 
    Client: Elektrociepłownia Białystok S.A.

    Contract value: PLN 85 million.
  • Construction of a new water treatment station for the nitrogen plant in Kędzierzyn
    Client: Zakłady Azotowe Kędzierzyn S.A. 
    Contract value: PLN 63 million.
  • Construction of a carburation installation at the Bełchatów Power Plant. 
    Client: SANDVIK Mining and Construction.
    Contract value: PLN 83.8 million.
  • Design, construction and assembly of machines, devices and equipment, as well as assembly of a complete flue gas desulphurisation installation for the power unit 10 (500 MW). 
    Client: Elektrownia Kozienice S.A. (ENEA Wytwarzanie S.A.).
    Contract value: PLN 75.5 million.
INTERNATIONAL PROJECTS:
  • 900 MW power unit in Mannheim, Germany.
    Scope of work: assembly of a steel structure and ducts (25,000 tons)
    Client: Alstom Power Service.
    Contract value: PLN 55 million.
  • Paper mill in Iggesund, Sweden.
    Scope of work: delivery and assembly of a steel structure along with a light casing of the walls and roofs.
    Client: Andritz Oy.
    Contract value: PLN 31 million.
  • Filborna waste-to-energy plant, Helsingborg, Sweden
    Scope of work: delivery and assembly of a steel structure and ducts (approx. 1,800 tons), assembly of the boiler (approx. 800 tons), delivery and assembly of pipelines (approx. 150 tons), assembly of technological devices.
    Client: Babcock & Wilcox Vølund A/S, NCC Construction Sverige AB.
    Contract value: PLN 38.8 million.
  • Ignis Power Plant, Spremberg, Germany.
    Scope of work: delivery and assembly of a steel structure of the boiler.
    Client: Baumgarte Boiler Systems GmbH.
    Contract value: PLN 15.2 million.
  • Pulp Mill Ence, Huelva, Spain
    Scope of work: delivery and assembly of a steel structure along with a light casing of the walls and roofs.
    Client: Andritz Oy.
    Contract value: PLN 13.9 million.
  • Paper mill in Workington, UK
    Scope of work: delivery and assembly of a support structure of the boiler. Weight of the structure: 1,135 tons. Assembly and installation of a casing (6,000 m2).
    Client: Andritz Oy.
  • Incineration plant in Luzern, Switzerland.
    Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler and the flue gas treatment installation. Weight of the structure: 1,550 tons.
    Client: Hitachi Zosen Inova AG.
  • Incineration plant in Vantaa, Finland.
    Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler. Weight of the structure: 2,000 tons.
  • Incineration plant in Plymouth, the United Kingdom. Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler. Weight of the structure: 1,760 tons.
    Client: Baumgrate Boiler Systems GmbH.
  • Incineration plant in Severnside, Bristol, UK.
    Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler and the flue gas treatment installation, assembly of equipment (coarse assembly) of, inter alia, a bag filter, fans, air heaters, ducts, pumps, chutes, tanks, etc. Weight of the structure: 2,800 tons
    Client: Hitachi Zosen Inova AG.

Repairs
  • Repairs of OP 650 boilers and auxilary systems in EDF Rybnik SA
  • Capital overhauls of ancillary equipment of OP 650EDF boilers in EDF Rybnik SA
  • General repairs of water boilers for the Energy Company "Jastrzębie" SA
  • Repairs of pressure parts of WP-70 boilers in PEC Gliwice Sp. z o. o.
  • Repair of an OOG-420 boiler No. 7, built at the Boiler Division of the Power Plant of the Polish Oil Concern ORLEN SA in Plock
  • Repairs of boiler drums with a capacity of 210t/h, 1520t/h in the Skawina SA CHP; the Krakow SA CHP; the Kozienice CHP; the Stalowa Wola CHP.
Modernizations
  • Modernization of OP650 boilers - prefabrication and installation of a hot hopper and II, III and V of the first stage of superheating in the "Rybnik" SA Power Plant
  • Modernization of WR-25 boilers in the EC Pniówek Energy Company "Jastrzębie" SA
  • Modernization of a dry FGD installation with moisturizing in "Rybnik" SA Power Plant
  • Modernization of electrostatic precipitators of Units No. 1,4,5,6 and 7 in the "Rybnik" SA Power Plant
  • Modernization of Units No. 4 and 6 with a capacity of 120MW in the Siersza SA Power Plant and participation in the execution of a semi-dry Flue Gas Desulphurization installation in the Siersza SA Power Plant
  • Reconstruction of power units No. 1 and 2 in the Siersza Power Plant - high-pressure and low pressure steam and hot water pipelines with fittings, equipment and auxiliary systems.
  • Modernization of the evaporator of OP-380 boilers No. 1 and 2, with a capacity of 380t/h in the Krakow SA Power Plant in order to reduce NOx emissions
  • Adaptations of limestone milling units into coal installations with burners and OFA nozzles and coal bunkers in the "Rybnik" SA Power Plant
  • Modernization of track bed steel structures, 396 m in length, for repair overhead cranes SM-l, SM-2, SM-3 in the nave of the turbine hall of the main building at EDF Rybnik SA
Assemblies
  • Prefabrication, delivery and installation of complete piping and an overflow tank for the EC1 CHP in Bielsko-Biala
  • Mechanical installation of the boiler and external piping in Strangnas Energie AB (Sweden)
  • Disassembly and assembly of OP-210M boilers with a capacity of 210t/h in the Skawina SA Power Plant
  • Erection of CFB 72.2 kg/s boilers for PKE SA - Jaworzno II Power Plant
  • Erection of three FM-120-97 BABCOCK boilers with a capacity of 120t/h with piping and an RS station in the Tyre Company in Dębica
  • Prefabrication and installation of pipelines on the Distillation II installation in RN LOTOS in Gdansk
  • Prefabrication, delivery and installation of technological pipelines, with an installation of technological equipment and fittings; erection of outdoor water tanks and the prefabrication, delivery and installation of support structures - flyovers, along with the prefabrication, delivery and installation of external piping for the task "Construction of a new Water Treatment Plant (WTP) in the Nitrogen Plant in Kędzierzyn
  • Prefabrication of pipelines, support structures and installation of technological equipment for pipelines of the installation for the production of liquid CO2 for Messer Poland Sp. z o. o.
  • Prefabrication and construction of the ZSR1 tank to achieve the rated capacity of the unloading, storage, transportation installation and the preparation of biomass for Units No. 1-4 in the "Rybnik" SA Power Plant
Deliveries
  • Prefabrication and delivery of steam superheater coils (I° and III°) for the OP-650 and AP-1650 boilers in the "Kozienice" Power Plant
  • Prefabrication and delivery of boiler flue gas ducts for the AP-1650 in the "Kozienice" Power Plant
  • Prefabrication and delivery of a boiler slag hopper for the AP-1650 No. 9 in the "Kozienice" Power Plant
  • Prefabrication and delivery of the ECO boiler water heater coils, 460 MW for the "Pątnów II" Power Plant
  • Prefabrication and delivery of the superheater coils III° for an OP-230 boiler in the "Skawina" Power Plant
  • Prefabrication and delivery of superheater coils for PAK Konin
  • Prefabrication and supply of pressure parts of RH1 and ECO boilers, 833 MW in BOT Belchatow (approx. 2.660t)
  • Prefabrication and delivery of the primary steam superheater III ° to OP650 boiler for the "Kozienice" Power Plant
  • Prefabrication and delivery of steam superheaters for OP-650 boilers for the "Kozienice" Power Plant
  • Prefabrication and delivery of a water heater for the Reno Nord project (according to the requirements of Directive 97/23/EC) for Babcock & Wilcox Volund ApS
  • Fabrication and replacement of a water heater for the OP-215 boiler No. 3 in the Nitrogen Plant "Pulawy" SA
  • Prefabrication and delivery of superheater elements for the OP-430 boiler in the Siekierki Power Plant
  • Prefabrication and delivery of steam superheater pipe elements for the OP-380 boiler in the "Stalowa Wola" SA Power Plant