Control and Measurement Instruments System in Bełchatów Power Plant
![](/sites/default/files/styles/capital_group_big/public/header-bg/2024-10/Jakos%C4%87_0_3.jpg?itok=Lwr98FLS)
"Supply and mechanical assembly of the Flue Gas Desulfurization (FGD) Installation for units no. 1-12 at the Bełchatów Power Plant. Work carried out between 1992-2011 commissioned by RAFAKO S.A. and HOOGOVENS."
![1](/sites/default/files/2024-10/1.jpg)
![8](/sites/default/files/paragraph.column.field_paragraph_image/2024-10/8.jpg)
![4](/sites/default/files/2024-10/3.jpg)
![6](/sites/default/files/paragraph.column.field_paragraph_image/2024-10/7.jpg)
![2](/sites/default/files/2024-10/2.jpg)
![7](/sites/default/files/paragraph.column.field_paragraph_image/2024-10/6.jpg)
![4](/sites/default/files/2024-10/4.jpg)
![5](/sites/default/files/paragraph.column.field_paragraph_image/2024-10/5.jpg)