Projects

Polimex Energetyka zdjęcie tło
Ongoing

The Kozienice Power Plant

Execution of construction and assembly work within the construction of FGD (Flue Gas Desulphurization installation) No. IV in Kozienice. Client: Babcock-Hitachi Kabushiki Kaisha SA Branch in Poland. Value of the contract: PLN 63 900 000 million.

CHP, Production Plant of PKN Orlen in Plock

Design, delivery and installation of flue gas catalytic denitrification and dedusting installations on turn key basis from CHP boilers in the Production Plant of the Polish Oil Concern Orlen SA in Plock. Client: PKN Orlen SA. Value of the contract: 378 402 000 PLN.

The Belchatow Power Station

Modernization and renovation of the main steam and water pipelines, Units No. 7-12 at Belchatow. Client: PGE GiEK SA. Value of the contract: 293 970 000 PLN.

The EDF power plant in Rybnik, Poland

Connection of Units No. 5, 6 and 8 to the WFGD installation (Wet Flue Gas Desulphurization) at EDF Poland SA, branch in Rybnik. Client: EDF Poland SA. Contract value: PLN 22 557 879.12.

Implemented

EPC

Supply and installation of two turbine generator sets with a capacity of 100 MWe each, along with design and accompanying work in the Żerań CHP. Client: the Power Plants in Warsaw SA (PGNiG Termika SA). Contract value: PLN 140 million Tz11 + PLN 171 million Tz12.

Implementation of Wet Flue Gas Desulphurization Installation in the Power Plant Rybnik. Client: Power Rybnik. Value of the contract: PLN 228 million.

Construction of the installation of renewable energy production based on biomass in the CHP Bialystok SA. Client: CHP Bialystok SA. Contract value: PLN 85 million.

Construction of a new Water Treatment Plant in the Nitrogen Plant in Kędzierzyn. Contract value: PLN 63 million.

Coaling plant construction in Belchatow. Client: SANDVIK Mining and Construction. Contract value: PLN 83.8 million.

Design, construction, supply of machinery and equipment, and installation of a complete Flue Gas Desulphurization block No. 10 - 500 MW. Client: "Kozienice" SA Power Plant (ENEA Production SA). Contract value: PLN 75.5 million.

Construction of a new power unit with a fluidized bed boiler, backpressure turbine, two peak boilers and heat accumulator in the Bielsko-Biala EC1 Power Plant. Client: PKE SA. Contract value: PLN 409.7 million.

Construction of a catalytic denitrification plant for OP-430 block boilers No. 10, 14, 15 and OP-380 boiler No. 11 in Siekierki. Client: Vattenafall Heat Poland SA (PGNiG Termika SA). Contract value: PLN 140 million.

 

Professional assembly

PLN Pressure part assembly in two boilers with a capacity of 1100 MW at Neurath. Client: Hitachi Power Europe, Alstom Power Boiler. Contract value: PLN 107.1 million.

Pressure part assembly in a boiler within the package No. 1,2,4,5 for a block of 858 MW in the Belchatow power plant. Client: ALSTOM Power Sp. z o. o. and RAFAKO SA. Boiler Factory. Contract value: PLN 59.5 million.

 

Foreign contracts

PLN PAPER MILL IGGESUND, SWEDEN. Scope of works: supply and installation of steel structures with walls and roof construction. Client: Andritz Oy. Net value of the contract: PLN 31 million.

WASTE TO ENERGY PLANT, HELSINGBORG, SWEDEN. Scope of works: supply and erection of steel structure and channels (c. 1800 tons), installation of a boiler (about 800 tons), delivery and installation of piping (about 150 tons), installation of process equipment. Client: Babcock & Wilcox Vølund A/S, NCC Construction Sverige AB. Value: PLN 38.8 million.

IGNIS POWER PLANT, SPREMBERG, GERMANY. Scope of works: supply and installation of steel structures. Client: Baumgarte Boiler Systems GmbH. Value: PLN 15.2 million.

PULP MILL ENCE, HUELVA, SPAIN. Scope of works: supply and installation of steel structures with walls and roof construction. Client: Andritz Oy. Value: PLN 13.9 million